Studies

March 10, 2017
This study assesses the potential economic impacts of the Naugatuck River Greenway.
Pathway to Revitalization: Economic Impacts of Phased Completion of the Naugatuck River Greenway
October 14, 2015
The Economic Impact of Greenways and Multi-Use Trails – A review of literature prepared as part of the Naugatuck River Greenway Economic Impact Study
May 22, 2014
In the fall of 2013 COGCNV performed a full system passenger count of the CT Transit - Waterbury division bus system. This report tracks bus ridership trends and makes recommendations for changes in the bus system.
August 19, 2013
COGCNV staff studied the intersection of Route 63 and Rubber Avenue in Naugatuck to identify and address existing traffic operations and safety problems. Staff conducted turning movement counts in September 2011 and analyzed three years of accident data to propose improvements that would increase safety and facilitate traffic flow.
August 5, 2013
COGCNV staff studied 12 signalized intersections on Route 10 in Cheshire to identify and address existing safety problems. Particular emphasis was given to short-term improvements such as improved signage, changes in traffic signal phasing, turning lanes, pedestrian improvements, and minor geometric improvements. For intersections with high accident rates, COGCNV staff recommended long-term safety improvements.
March 18, 2013
This memorandum analyzes use of the 13 state commuter parking lots and three railroad parking lots in 2012 and recommends improvements to more effectively use the lots in the region.
March 1, 2013
COGCNV staff conducted turning movement counts at the intersection of Route 63 and Route 64 in September 2011 and February 2012.

Pages